Author: Darren

  • Steel Frame Installation: Revamping Building Interiors

    Steel Frame Installation: Revamping Building Interiors

    The new internal steel frame has flown up from basement level up to the second floor with the third floor and roof steelwork soon to be in as well. The new steelwork has enabled the existing walls to be removed and completely transform the space inside.

  • Beautiful Timber Joinery in New Rear Extension

    Beautiful Timber Joinery in New Rear Extension

    Progression of the new single storey rear extension with an existing thatched roof is well under way. The extension is constructed using timber framing with carefully constructed and beautiful joinery.

  • Overcoming Site Constraints with Ground Beam Design

    Overcoming Site Constraints with Ground Beam Design

    Piles have been installed at a 2 storey new build property in Brislington. Ground beams are being formed ready for the first concrete pour. Existing public sewers running below the footprint of the new building have restricted the depth of the foundations and ground floor. We have carefully designed the ground beams to avoid disturbing…

  • New Build ICF Home

    New Build ICF Home

    We have recently been appointed to design a new build ICF (Insulated Concrete Formwork) house in Somerset. The Architecture is led by Studio Scaramanga architects and has been designed to be visually striking internally and externally. This home will feature a semi-basement, cantilever balconies and a vaulted roof structure that mimics the hull of a…

  • Exploring a Stunning Grade II Listed Church Conversion in Bath City Centre

    Exploring a Stunning Grade II Listed Church Conversion in Bath City Centre

    We have recently been appointed on a Grade II Listed church conversion in Bath city centre! The Church is to be converted into offices and six residential flats. We went to visit the Church this week and it is an absolute stunner. The roof is in near perfect condition with its original joinery. The new…

  • And We Are Off!

    And We Are Off!

    From the start of July, Darren and Joe are officially fulltime working on this new adventure together. We are incredibly excited to start this new business together and hope to get off on a flying start!